Skip to content

All articles

Browse by topic

No articles found for that search.

Private practice Specialty Management CSSD

Self-assessment

What does your medical unit need?

Tell us who you are and what you need. A person who knows the equipment replies — not a call center.

Follow us

Testimonials

What those who operate every day say

  • We went from improvising with adapters to having a room that simply works. The change was felt from week one in setup times.
    Dra. Mariana Robles Head of Surgery · Private hospital, Mexico City
  • What I value most is that they answer. Having original parts and someone who knows the device completely changes the conversation with management.
    Ing. Rodrigo Cázares Biomedical Engineering · General hospital
  • Image quality and lighting stopped being a topic in my surgeries. It sounds simple, but that is exactly what you want from technology.
    Dr. Alejandro Iturbe Laparoscopic surgery
  • The service contract made maintenance spend predictable. We stopped budgeting emergencies and started planning.
    Lic. Paula Nieto Administrative Director · Hospital group

FAQ

What we get asked before working together

01 Do you work with public and private hospitals?

Yes. We serve public institutions through the corresponding tender processes, and private hospitals, clinics and practices directly.

02 Can I integrate an OR that is already built?

In most cases, yes. We perform a technical survey to verify slab, conduits and electrical load, and propose a feasible scope without major construction when possible.

03 What does a service contract include?

Scheduled preventive maintenance, corrective service with committed response times, original spare parts and a technical log for audits.

04 Do you train the staff?

Yes. Every delivery includes training for medical, nursing and biomedical engineering staff, and we leave reference material on site.

05 Do you carry original spare parts?

We work exclusively with original parts from the brands we represent, and keep stock of the highest-turnover items.

06 How long does an integration project take?

It depends on scope. A room on existing infrastructure can take weeks; a turnkey project with construction is phased together with the hospital.

Clinical newsletter

One useful note a month. No sales noise.

  • Medical equipment advances
  • Purchasing criteria
  • Lessons from real projects
Sign me up

Unsubscribe whenever you want.

News

Clinical newsletter

One useful note a month on operating rooms, medical equipment and sterilization. No sales noise.